Central Tyrolean Insurance
Commercial building, Innsbruck
The Tyrolean insurance company built a new headquarters in the heart of Innsbruck using local timber as a building material. As a system supplier, we delivered solid wood elements for this modern timber construction. The CLTPLUS and glulam solid timber components were installed within a period of 5 months. With the new headquarters building, Tiroler Versicherung is setting a pioneering example of ecological and sustainable construction. The site on the corner of Wilhelm-Greil-Straße and Gilmstraße in Innsbruck was expanded in terms of area in order to integrate forward-looking, energy-efficient and regional building materials with a minimised ecological footprint.
In the small-scale fire test, a CLTPLUS ceiling element with 140 mm 5-ply and a CLTPLUS wall element with 100 mm 3-ply were tested for combustible pipes, cable fire protection sleeves, fire damper, combi bulkhead fire protection mortar and socket outlet insulation.
Test result: all test specimens withstood the test for over 90 minutes. During this test, the sensors were also inserted into the ceiling to determine the burn-off rate. The result: the test was completed after 102 minutes and a temperature of 2° was measured on the surface of sensor 11.
Achieve
great things
together