Timber construction planning

We plan and
produce constructively

How do you achieve resource-efficient factory planning for glulam and CLTPLUS? Fine-tuning between architecture, structural planning, timber construction and our experienced technical timber construction team is crucial for the smooth running of the project right from the early project phase.

Service portfolio

We are happy to support you as an industry partner and work together to create a perfect intermeshing of all planning processes. This allows the timber construction project to benefit from modern production technologies. The future belongs to timber construction and THEURL’s service portfolio contributes to the success of the project.

Your advantages

  • Efficient planning process
  • Cutting-optimised project development
  • Time savings
  • Cost reduction
  • Expertise shortens the planning process
  • Reduction of error sources

The degree of completion
of your project
is a ...

01

Submission plan (2D)

Our possibilities:

  • Offer as per service package 1
  • Offer according to service package 2
  • Offer according to service package 3

02

3D plan

Our possibilities:

  • Offer as per service package 2
  • Offer according to service package 3

03

Work plan

Our possibilities:

  • Definition of the lifting equipment
  • Evaluation of defined joinery details
  • Check for feasibility
  • Elementation, waste optimisation

Achieving
great things
together

FOR ERROR-FREE
FACTORY PLANNING ARE
SOME STEPS
NECESSARY

We offer a service portfolio with three different development stages. Of course, we can also take on the complete project development on request. We will be happy to prepare a quotation for the technical service.

Service package 1

Mass determination

  • Mass determination according to plan
  • First quotation with gross volume,
    standard bundling by area and delivery costs

Service package 2

3D project development with area optimisation

  • 3D mass determination with surfaces and
    waste optimisation, nesting in advance
  • Division of the components
  • Project is designed from 2D to 3D
  • Standard trimming of components
  • Definition of the lifting equipment and the necessary
    processing
  • Clarification of all special processing, if
    available or defined in the plan

Service package 3

3D project development with cross-section optimisation

  • All services of package 2
  • Examination of optimisation proposals
    of the structural cross-sections (preliminary design),
    final check by structural engineer necessary
  • Detail proposals for structural
    fasteners according to the respective requirements

Step by step

The course of the project
at a glance:
From planning to
to delivery to the construction site

The production capacities are reserved and the exact delivery date is set based on the existing planning status. Our digital customer portal is available to track the project status at any time. The TIM application also enables secure and standardised data exchange for plans and all documents.

SEMA, Dietrich’s, cadwork and hsbcad, our internal technical timber construction team develops the waste-optimised detailed planning and determines the final nesting. In addition, the error-free work plan is crucial for the production of the individual elements
is crucial, i.e. the assembly sequence is defined and all details for the joinery services, including lifting equipment, have been created.

The correct sequence of the individual components is created and defined virtually in advance. Important logistics details are planned, such as the weight and package size, the type of lorry to be used or the country-specific import requirements for container loading and customs clearance.
import requirements for container loading and customs clearance are defined.

produce resource-saving glulam and CLTPLUS for modern timber construction.

CLTPLUS panel dimensions

  • Thickness 60-360 mm,
  • Length 8-16 m, width 2.25-3.5 m
  • Grid dimensions: 225, 245-295, 310,
  • 330 and 350 cm

Glulam cross-section

  • Width 60-280 mm, length 6-18 m
  • Height 120-1280 mm

the individual components are processed with high dimensional accuracy and precision on the joinery machines. This includes
This includes openings, milling, prefabrication for lifting equipment and much more.

our product refinement on an ongoing basis. With our special solutions, we can offer factory pre-assembled construction time protection, ribbed ceilings, XFIX connections, stairs and the key technology TS3.

A detailed logistics concept is drawn up in advance with the project partners for the delivery to the construction site. This includes, for example, coordinating time slots, access routes and obtaining authorisations. This means that nothing stands in the way of a smooth delivery.

Building physics with CLTPLUS?
It works.

For users from the fields of timber construction, architecture and engineering

The strict building physics requirements that apply in this country not only ensure pleasant, but also safe living and recreational environments. Our CLTPLUS components offer numerous advantages, especially in multi-storey timber construction.

  • Fire protection, sound insulation, thermal insulation, moisture protection