Steinblock Climbing Hall, Imst
Commercial construction, Tyrol
Bouldering is booming. Our joinery service centre has realised a challenging project and also ventured a look into the vertical. A new bouldering wall was constructed and our joinery team was able to enjoy this sporting endeavour. The 1,750 individual parts for the substructure of the entire bouldering area were prefabricated with precision. We are pleased to be able to introduce you to this somewhat different type of joinery work.
Project information
Use: Climbing hall
Location: Imst, Tyrol
Completion: 2017
Theurl products used: 53 m³ glulam
Product information
Individual parts: 1,750
Joinery time: 120 h
Machining operations: 10,400