Theatre in the Prater
Vienna
The new theatre in the Prater Park is creating a modern performance venue in Vienna that combines sophisticated architecture with innovative timber construction. The building offers space for large-scale musical and theatre productions and, due in particular to its complex geometry, places high demands on design, fabrication and assembly. THEURL is supplying around 725 m³ of CLTPLUS for the project.
Project information
USE: Commercial building
LOCATION: Vienna
PLANNED OPENING: 2027
THEURL PRODUCTS USED: 725 m³ CLTPLUS
Project partners
TIMBER CONSTRUCTION: Strobl Bau – Holzbau GmbH
LOCAL BUILDING CONTROL, CERTIFICATION: Delta Pods Architects
THEATRE ARCHITECTURE: Haworth Tompkins, London
GENERAL PLANNING AND LOCAL ARCHITECTURAL PARTNER: Dietrich Untertrifaller
The design places high demands on the architecture, structural engineering and building services. In theatre construction in particular, numerous functions must be integrated within a confined space, ranging from stage technology and acoustics to ventilation.
This is where the precise prefabrication of timber components plays a crucial role: THEURL produces CLTPLUS elements for the various areas of the building which are machined to exact specifications and are prepared for assembly in accordance with the project-specific requirements.
Thanks to state-of-the-art CNC technology and a high level of manufacturing precision, THEURL is able to meet these complex requirements with great accuracy. The result is ready-to-assemble components that minimise the need for on-site adjustments and enable the efficient realisation of this challenging theatre construction project.
Achieving
great things
together