Buff Medical Resort
Hotel construction, Constance
Directly on Lake Constance and in the city of Constance, there is a new health resort with the highest level of comfort of a 5-star hotel and unique medical care. The client sees the Buff Medical Resort as more than just a place of healing. Everything here revolves around the topic of health. So what could be more perfect than the construction material CLTPLUS?
Project information
Use: Health resort
Location: Constance
Completion date: January 2025
Installed volume: 3,247 m³ CLTPLUS ceiling elements
Project partners
Builder: Buff Medical Resort GmbH
Timber construction: Willi Mayer Holzbau GmbH & CO. KG
Architecture: Rebholz Architects and Engineers
Pictures: Buff Medical Resort
Numerous advantages make
timber a favourable building material
Timber offers many benefits as a building material that were decisive for the health centre. It creates a healthy indoor climate, reduces energy consumption thanks to its bulk density and thus lowers operating costs. The natural breathability and moisture-regulating properties of wood promote the health of guests during their stay. In summer, wood provides pleasant cooling, even at high outside temperatures. In winter, it keeps one warm thanks to its ideal thermal conductivity.
For a project of this size with 3,247 m³ of CLTPLUS solid timber panels, the timber construction system offers decisive advantages. The elements were produced and processed in the factory and assembled directly on the construction site by Holzbau Willi Mayer. In total, more than 1,420 project-related solid timber components processed on CNC machines were installed, with the underside of the ceiling being realised in residential quality.
Achieving
great things
together