DEME in Belgium, a world leader in marine technology in the fields of dredging, marine infrastructure and the offshore energy market, has built a new administration building for its employees.
Project information
Use: Office building
Location: Zwijndrecht, Belgium
Completion: 23/2024
Theurl products used: approx. 730 m³ CLTPLUS
Project partners
Timber construction: LTS Belgium
Client: DEME Group
Architecture: Polo Architects
Hybrid construction with timber from THEURL
DEME office building
Test
Solution approach
The architectural firm Polo Architekten designed a hybrid office building for its client DEME. The walls, ceilings on the upper floor and the rof are built with CLTPLUS solid timber elements. LTS Laminated Timber Solutions carried out the timber design and construction. Between June 2022 and November 2022, 15 fully loaded lorries left THEURL’s factory in Steinfeld.
Result
A total of 730 m³ of CLTPLUS wall and ceiling elements in industrial plus quality were installed. The challenge in this project was the joinery, as this was complex due to the end face machining. In some cases, the maximum machining depth of the joinery machines was required for the slots and cut-outs. A total of 2,500 precise drillholes were required for this project.