The Vivea Spa Hotel, Bad Bleiberg
Hotel construction, Bad Bleiberg
The Vivea 4* Hotel in Bad Bleiberg has undergone a general refurbishment. A generous extension was realised with CLTPLUS in a short space of time. Hotel refurbishments are always complex and planning-intensive projects. Here in particular, the timing and duration of the renovation play a decisive role. Smooth coordination and as few interfaces as possible between all parties involved are particularly important in this segment.
The challenge
The particular challenge in this project was to perfectly harmonise and connect the old and new buildings. The precise CLTPLUS elements, prefabricated to the millimetre, were the ideal building material for this construction task, as they enabled a perfect and seamless connection to the existing building. Some of the new elements could thus be easily “pushed” into the existing building.
Customised to the millimetre
The special, curved shape of the indoor pool area also posed no problems for the material or the designers. As the CLTPLUS elements can be bound in almost any shape, the semi-circular shape of the indoor pool posed no problem from a structural point of view. In total, our partner Holzbau Lindner used 175 m³ of glulam and 680 m³ of CLTPLUS in the project.
Achieve
great things
together