Twin²Sim
Commercial construction, Salzburg
The Twin²Sim project not only marks the largest single investment in the 25-year history of the Salzburg University of Applied Sciences, the research building on the Kuchl campus is also designed to be particularly smart and sustainable. The test centre for buildings and façades consists of a rotating test stand, test rooms and a multifunctional laboratory and is used for the integrated investigation of complex building envelopes and building technology.
A total of 165 m³ of CLT elements (in industrial, industrial plus and visible quality) and 15 m³ of glulam (in industrial and visible quality) were used for the office building and warehouse. The combination of different qualities, different panel thicknesses and the division of the exposed walls and ceilings presented a major challenge in terms of material and appearance.
The extra-wide transport (the widest component measured 3.443 metres), walls more than seven metres high and the fact that the office building had to be delivered in two sections were more of an incentive than an obstacle for THEURL’s dedicated team, which successfully proved itself as part of a large project group.
Achieve
great things
together