The construction work on the swimming pool took place within a tight time frame: The construction had to be completed between November 2024 and April 2025 so that the swimming pool could be inaugurated on time for the start of the outdoor swimming season. THEURL supplied a total of 179 m³ of glulam and 162 m³ of cross-laminated timber for the innovative construction. A honeycomb construction made of glulam serves as the main supporting structure and ensures efficient load distribution and increased load-bearing capacity. CLTPLUS from THEURL was used for the ceiling. As a robust yet lightweight material, cross-laminated timber is ideal for short construction times. Thanks to close cooperation and coordination between planning, execution and material delivery, the tight schedule could be adhered to. The result was a sustainable, aesthetically pleasing building in a short space of time.