'Im Zelg' project
Housing, Uster Canton Zurich
An environmentally aware neighbourhood development is being built on Zelgstrasse in Uster in the canton of Zurich. With five residential buildings and a total of 164 rental flats in timber construction, this site will combine modern living with the raw material wood. The CLTPLUS solid timber product is being used for the ceiling elements.
Project information
Use: Residential building
Location: Uster in the canton of Zurich
Completion date: 2026
Theurl products used:
approx. 3,500 m³ CLTPLUS
Project partners
Timber construction: Renggli AG
Client:
UBS Sima (UBS Fund Management (Switzerland) AG)
Architecture: Bednar Steffen Architekten AG
Prime contractor: Rhomber Bau AG
Solution approach
The new design by Rhomberg Bau AG has resulted in a concept for five buildings with environmentally friendly construction methods and future-orientated technologies. Regarding the timber construction, the aim was to use a system that structurally allows a two-way slab timber construction method. This challenge can be met with our key technology TS3.
Result
The end face joint seal creates frame structures without joists. A primer and assembly sealing tape are attached to the CLTPLUS ceiling element in the THEURL factory. The joints are filled on site. The advantage of this application: flexible and point-supported floor slabs are created without fasteners and bonding pressure.
Achieving
great things
Together