Construction Site in the Tyrol

First Wooden High-Rise in Innsbruck

Tiroler Versicherung (insurance company) is building a new, sustainable headquarter in the heart of Innsbruck using wood, which is of course a local building material. As a system supplier, we supply solid wood elements for this modern timber construction. Over a period of 5 months, more than … of solid wood components will be installed.

Project data

Timber construction
Holzbau Saurer

Location
Innsbruck city center

0

Floors

0

Delivery time

0

trucks 

Tiroler Bau(m)stelle: construction diary

MAY 2023

X

22/05/2023
Arrives safely and on-time every time!

The next mileage stones are closer than you think! The 1st truck is heading for Innsbruck, fully loaded. The individual elements have already been wrapped together in plastic in our loading hall. This protects the wood from dirt on the road, as well as rain and UV radiation. A total of 19 trucks will be loaded in the next few weeks. A timber structure will be created with more than 950 m³ of solid wood panels.

It is essential to plan exactly how the individual elements are loaded, especially for inner-city projects. This is the only way to meticulously adhere to closely timed construction schedules. Therefore, it’s crucial to load the individual components on the truck in the right order to ensure rapid on-site assembly. How do we achieve this?

The software solution Load Space Optimization (LRO) allows us to load the truck virtually in advance. This not only allows the loading capacity of trucks to be fully utilised, it also takes account of the required assembly sequence. This saves a lot of time on-site.
 

 

 

MAY 2023

X

22/05/2023
Arrives safely and on-time every time!

The next mileage stones are closer than you think! The 1st truck is heading for Innsbruck, fully loaded. The individual elements have already been wrapped together in plastic in our loading hall. This protects the wood from dirt on the road, as well as rain and UV radiation. A total of 19 trucks will be loaded in the next few weeks. A timber structure will be created with more than 950 m³ of solid wood panels.

It is essential to plan exactly how the individual elements are loaded, especially for inner-city projects. This is the only way to meticulously adhere to closely timed construction schedules. Therefore, it’s crucial to load the individual components on the truck in the right order to ensure rapid on-site assembly. How do we achieve this?

The software solution Load Space Optimization (LRO) allows us to load the truck virtually in advance. This not only allows the loading capacity of trucks to be fully utilised, it also takes account of the required assembly sequence. This saves a lot of time on-site.
 

 

 